How We Work
Four things happen on nearly every job, in the same order, whether it is a dead outlet or a new service.
- Assessment. Darnell Roberts or one of our journeyman electricians arrives with a truck loaded with parts and looks over the job.
- The options. What needs to be done is explained. Nothing starts until you approve the plan.
- The work. Power is shut off where it has to be, and the wiring, boxes and devices go in.
- Testing. Circuits are tested under load, connections and fixtures are checked, and the panel is labeled so the next electrician can follow it.
Stage by Stage
Scroll right for the other columns.
| Stage | What generally happens | How you can prepare |
|---|---|---|
| First call or message | We ask a few questions about the problem and set a time | Say what is out, what was running and how old the building is |
| Assessment | An electrician looks over the job: the rooms, the panel, the path a wire would take | Clear the panel and the work area; have the list of problems ready |
| The options | What needs to be done is explained, with the choices where there are any | Ask what each choice leaves for later |
| The work | Power goes off where needed; wiring, boxes and devices go in | Save work on computers, plan for refrigerators and gate openers |
| Testing | Circuits are tested under load, connections and fixtures are checked, the panel is labeled | Walk through and try every switch and outlet yourself |
| Inspection | Where there is a permit, the city or county inspector looks at the work | Someone has to be there to open the door |
How New Electricians Learn Here
New crew members begin by assisting on service calls and learning to trace a fault before touching anything. Then they take on small installations, which Darnell reviews. A fault that is guessed at tends to come back; one that is traced does not.
Safety and Code Rules
Scroll right for the other columns.
| Rule or area | What it covers | Why it matters |
|---|---|---|
| California Electrical Code | How wiring, panels and devices are installed; built on the National Electrical Code with state changes | It is the standard an inspector checks against |
| Permits and inspections | Panels, services, new circuits, chargers, spas and rewiring | A second set of eyes, and a record when the building is sold or insured |
| GFCI and AFCI protection | Damp places for GFCI, living areas for AFCI | One guards against shock, the other against arcs that start fires |
| Grounding and bonding | The path that carries fault current back, and the bonding of metal pipes and tubs | Without it a breaker may not trip when it should |
| Shutting off power | Breakers locked or tagged, circuits tested dead before hands go in | Labels are often wrong; a tester is not |
| Contractor licensing | In California, electrical contracting falls under the C-10 classification | Anyone can look up a contractor with the Contractors State License Board before work starts |
Get Ready for the Visit
Tick what is done; the list keeps what is left.
Your list shows here once you press the button.
Permits, Inspections and Surprises
Who applies for the permit?
Usually the contractor doing the work. Inside the city limits of San Diego it goes through the Development Services Department; other cities have their own building departments, and unincorporated areas go to the county.
What does an inspector look at?
The panel and its working space, breaker and wire sizes, grounding, boxes and covers, and that protection such as GFCI works. On larger jobs there is a look before walls close and another at the end.
What happens if something else turns up?
Older buildings hide things. When a wall or a box shows a problem that was not in the plan, the plan changes, and that is explained before the work goes on.
Can I stay home during the work?
For most jobs, yes. Expect noise, some dust where walls are opened, and rooms without power for part of the day.